Product Description
S sequence CZPT cal Geared CZPT Traits
one. Characteristics:
- Substantial effectiveness: 75%-eighty%
- Substantial technology: the helical equipment and a CZPT merged with an built-in transmission to increase the torque and effectiveness.
- Substantial precision: the gear is produced of high-high quality alloy metal forging, carbonitriding and hardening remedy, grinding method to make certain higher precision and stable operating.
- Higher interchangeability: hugely modular, serial design and style, robust flexibility and interchangeability.
2. CZPT nical parameters
Ratio | six.8-288 |
Enter CZPT | .twelve-22KW |
Output torque | 11-4530N.m |
Output speed | 5-206rpm |
Mounting kind | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange enter(AM), shaft enter(Ad), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook release(lock in the brake launch place), HR-manual launch(autom-atic braking place) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 high-power solid iron from R37,47,fifty seven,67,77,87 |
Housing materials | HT250 CZPT power forged iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening therapy |
One Stage Performance | seventy five%-80% |
Lubricant | VG220 |
Defense Class | IP55, F class |
About Us
ZheJiang CZPT glow CZPT Co.,Ltd,the predecessor was a state-owned army mould organization, was proven in 1965. CZPT shine specializes in the complete CZPT transmission resolution for higher-conclude tools manufacturing industries primarily based on the goal of “System Product, Software Style and Skilled Provider”.
Starshine have a sturdy technical power with over 350 personnel at existing, including above 30 CZPT experts, thirty high quality inspectors, masking an area of 80000 sq. meters and sorts of CZPT d processing machines and testing equipments. We have a excellent basis for the industry software development and services of large-conclude pace reducers & variators owning to the provincial CZPT technologies analysis center,the lab of equipment velocity reducers, and the foundation of modern day R&D.
Our Group
Top quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping
Equipment reducers are also named reducers. Mechanical components, by possibly of these two names, are made to minimize the electrical power transferred amongst the motor and the machine amongst the rotational speeds (revolutions per moment). The reducer efficiently decreases the rotational pace created by the motor, thus managing the pace at which the machine runs and escalating the torque created by the motor. Multiplying the torque created by the motor raises the machine’s obtainable power – a procedure recognized as “mechanical dominance”. In a bigger context, equipment reducers are basically resources used to increase the performance of tools procedure.