F series Parallel Shaft-CZPTcal Geared Motor Traits
one.Features:
- High performance: ninety two%-ninety four%
- Parallel output, compact construction, massive output torque, clean operation, reduced noise and prolonged services daily life.
- Large precision: the gear is created of higher-quality alloy metal forging, carbonitriding and hardening treatment method, grinding procedure to make sure large precision and secure working.
- Higher interchangeability: very modular, serial design, powerful versatility and interchangeability.
2. CZPT parameters
Ratio | three.seventy seven-276.seventy seven |
Input electricity | .twelve-200KW |
Output torque | three.5-21700N.m |
Output speed | 5-352rpm |
Mounting variety | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Approach | Flange input(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Release | HF-handbook launch(lock in the brake launch place), HR-manual release(autom-atic braking place) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Type | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 large-toughness forged iron from R37,47,fifty seven,67,77,87 |
Housing substance | HT250 High strength cast iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
Performance | 92%-ninety four% |
Lubricant | VG220 |
Protection Class | IP55, F class |
CZPTshine Travel
ZheJiang CZPTshine Travel Co.,Ltd,the predecessor was a point out-owned army mould organization, was proven in 1965. CZPTshine specializes in the total electrical power transmission remedy for higher-stop products production industries dependent on the purpose of “Platform Product, Software Style and Specialist Provider”.
CZPTshine have a powerful technical power with in excess of 350 staff at present, such as more than thirty engineering specialists, 30 high quality inspectors, masking an location of 80000 square meters and sorts of superior processing machines and testing equipments. We have a excellent basis for the industry application growth and services of large-stop pace reducers & variators proudly owning to the provincial engineering technology investigation center,the lab of equipment pace reducers, and the foundation of modern R&D.
Our Group
High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
All our products get ISO & CE & UL certification.
Packing
Shipping